• 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
  • 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
  • 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
  • 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
  • 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
  • 8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler pictures & photos
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
US $1.28-1.52 / Piece
Min. Order: 500 Pieces
Manufacturer/Factory, Trading Company
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)
  • Overview
  • Packaging & Shipping
  • Certifications
Overview

Basic Info.

Model NO.
model C
Framework
Combined Scaffolding
Supporting Mode
Suspended Scaffolding
Lapping Form
Single Row Scaffolding
Erection Position
External Scaffolding
Move Method
Horizontal mobile Scaffolding
Scaffolding Part Type
Scaffolding Couplers
Construction Properties
Building Scaffold
Standard
En74/BS1139/JIS
Size
34mm, 42mm, 48.3mm, 60mm
Surface
Electro Galvanized, Hot DIP Galvanized, Powder COA
Types
Pressed, Forged
Materials
Q235/Q355 Strength Steel
Manufacturability
500000PCS/Month
Transport Package
Pallet
Specification
Multiple
Trademark
Total Contec
Origin
Wuxi, China
HS Code
73084000
Production Capacity
50000 Tons/Year

Packaging & Delivery

Package Size
1.00cm * 1.00cm * 1.00cm
Package Gross Weight
300.000kg

Product Description

                                       Scaffolding one-stop Solution
China Wuxi Total Scaffolding Manufacturer. Wuxi factory and Tangshan Factory
Main products: Ringlock, Cuplock, Octagonlock, Kwikstage, Frame, Haki, Aluminum tower, Shoring prop, Couplers.


                                            Instrument and equipment
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
 
Item Code: FDC1  Item Code: FSC2 Item Code: FGC3 Item Code: SGC4 Item Code: FSSC5 
forged double coupler forged swivel coupler fixed girder coupler swivel girder coupler forged side by side coupler
Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3*42mm
Weight: 1.05kg Weight: 1.15kg Weight: 1.65kg Weight: 1.65kg Weight: 0.75kg
Item Code: USFDC1  Item Code: USFSC2 Item Code: FPC3 Item Code: FBRC4 Item Code: FIJP5
US forged double coupler US forged swivel coupler forged putlog coupler board retaining coupler forged inner joint pin
Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm
Weight: 1.65kg Weight: 1.5kg Weight: 0.65kg Weight: 0.61kg Weight: 1.15kg
Item Code: FGDC1  Item Code: FGSC2 Item Code: 60FC3 Item Code: 60FSC4 Item Code: 89FC5
Germany double coupler Germany swivel coupler forged fixed coupler forged swivel coupler forged fixed coupler
Size: 48.3mm Size: 48.3mm Size: 48.3*60mm Size: 48.3*60mm Size: 48.3*89mm
Weight: 1.25kg Weight: 1.45kg Weight: 1.35kg Weight: 1.45kg Weight: 2.59kg
Item Code: UKPDC1  Item Code: UKPSC2 Item Code: PSC3 Item Code: PIJP4 Item Code: 89FSC5
UK Pressed Double Coupler UK Pressed swivel Coupler Pressed Sleeve Coupler Pressed inner Joint Pin forged swivel coupler
Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3*89mm
Weight: 0.85kg Weight: 1.01kg Weight: 1.01kg Weight: 0.82kg Weight: 2.71kg
Item Code: JISPDC1  Item Code: JISPSC2 Item Code: PPC3 Item Code: PFC4 Item Code: FHC5
JIS Pressed Double Coupler JIS Pressed swivel Coupler Pressed putlog coupler Pressed Fencing Coupler forged half coupler
Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm
Weight: 0.68kg Weight: 0.68kg Weight: 0.65kg Weight: 0.5kg Weight: 0.55kg
Item Code: PMC1 Item Code:PLC2 Item Code: PBF3 Item Code:SCBC4 Item Code: UHC5
Pressed mushroom coupler Pressed ladder Coupler Pressed Brazil fixed coupler Press Brazil swivel  Coupler U head coupler
Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm Size: 48.3mm
Weight: 0.25kg Weight: 0.65kg Weight: 1.21kg Weight: 1.25kg Weight: 1.2kg
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

 

Provides a 90°Degree fixing of Vertical and Horizontal Tubes. This is a load bearing fitting complying to
BS 1139 1991, EN74 A.

8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Packaging & Shipping

8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

Certifications

8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler

1.  Q: What is your product range? A: Ringlock, Cuplock, Frame, Couplers, aluminum scaffolding tower, scaffolding accessories.
     Q: What is MOQ? A: Usually we don't have a MOQ, but it depends on the product you are looking for.

2.  Q: What kind of payment term do we accept?  A: West Union, T/T and L/C.
     Q: Can I get samples? Yes, we offer free samples on most itmes if it is not too heavy or big. freight collect
     Q: How is your factory's production capacity? A: Over 500 tons per month.

3.  Q; Where have you been exported? We have exported to Asia, South Ametica, Europe, Africa and Middle east.
     Q: What kind of international certificate do we offer? A: CE certificate and SGS test report.
     Q: How can you assure the welding quality?  A: We have made the flaw detection test which can prove the good welding quality.

4.  Q: What is production time?  Usually it takes 25-30 days for the first container,production goes faster after the first container once 
     all raw materials are ready.The more the faster. Partial shipment can be arranged if requested.

5. Q: How does your factory control quality? 
   A: Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional 
   steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from 
   raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6. Q: How is the bearing capacity of your scaffolding?
    A: It depends on which kind of scaffolding, scaffolding sizes, and the setup plan. We have many test reports for your reference.

7. Q: How High can your scaffolding reach to?
    A: Normally, we suggest our client to setuo the scaffolding maximum reach to 30 meters. But some of our customers setup our
    scaffolding reach to 50 meters. According to safety documents, every 20 meters, we need to make a steel platform where the 
    scaffolding can be setup continually.

8. Q: What is your after-sale service?  A: All the after-sale problems will be solved based on mutual friendly communication.
    In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your 
    warehouse.  In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed 
    certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss 
    will be compensated as the new goods sent to your side in next order.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler pictures & photos
8% off En74 BS1139 Pressed Forged Swivel Scaffold Fixed Scaffolding Pipe Tube Coupler
US $1.28-1.52 / Piece
Min. Order: 500 Pieces
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory, Trading Company
Plant Area
>2000 square meters
OEM/ODM Availability
Yes