• Aluminium Alloy Scaffolding Plank
  • Aluminium Alloy Scaffolding Plank
  • Aluminium Alloy Scaffolding Plank
  • Aluminium Alloy Scaffolding Plank
  • Aluminium Alloy Scaffolding Plank
  • Aluminium Alloy Scaffolding Plank

Aluminium Alloy Scaffolding Plank

Material: Aluminum Alloy
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Projecting Scaffolding
Lapping Form: Double Scaffolding
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company
Diamond Member Since 2021

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Project Application
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
model C
Erection Position
External Scaffolding
Move Method
Lifting Bridge
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Building Scaffold
Width
19.25′′/19′′
Lbs
75
Transport Package
Woven Bags with Pallets or Others
Specification
Customized
Trademark
Total Contec
Origin
China
HS Code
761090
Production Capacity
3000 Tons/Year

Product Description

Product Description


•Aluminum Alloy Material: 6061-T6

• Safe Working Loading (SWL): Min75Ibs/Square Foot  10ft With Min50Ibs/Square Foot

• Length: 2'-10' Or Customized Design

• Width: 19.25''OR 19''

• Surface: Anti-Skidding Corrugated Strips

• Offset Hooks: 2/3 Pieces Each End (0.17kg/Pieces Approximately)   

• Packaging Way: Bulk Packing Or Palletized With Strong Ties Protected
 

Detailed Photos

Aluminium Alloy Scaffolding PlankAluminium Alloy Scaffolding PlankAluminium Alloy Scaffolding Plank
Aluminium Alloy Scaffolding Plank

Product Parameters
Aluminium Alloy Scaffolding PlankAluminium Alloy Scaffolding Plank

 

Project Application


Aluminium Alloy Scaffolding PlankAluminium Alloy Scaffolding Plank

Certifications

Aluminium Alloy Scaffolding Plank

Packaging & Shipping

Aluminium Alloy Scaffolding PlankAluminium Alloy Scaffolding Plank

FAQ

1.  Are you trading company or manufacture?    
We have two factories in Jiangsu and Heibei Province

2. How about the delivery time?    
10-15 days after receiving the deposit (1*40FT)    
We can sent out products within 2 days if we have stock

3. What's your production capacity?    
Jiangsu factory produce 20000 tons one year.    
Heibei factory produce 30000 tons one year.

4. What certificates do you have?    
We have ISO 9001, ISO14001, OHSAS 18001, CE, SGS, ANSI, AS/NZS and etc.

5.  Can you do customized design?  
 Yes, our professional technical team will offer you perfect solution

6. Do you support sample order?    
Yes, we can offer samples for testing before placing batch order

7. What is your payment term?    
Our payments are usual T/T and L/C. But some quality customers will offer 30-45 days credit

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now