Customization: | Available |
---|---|
Material: | Aluminum Alloy |
Type: | Mobile |
Still deciding? Get samples of US$ 800/Set
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Aluminum mobile tower is in a wide variety of application, such as decoration, maintenance, and some non-heavy load work
including suspended ceiling, lighting, and partial of facade wall installation and repairing. Sometimes it can be used in film and
television shooting.
Compared to steel scaffolding system, aluminum tower, or aluminum scaffolding is flexible and mobile, it significantly reduces the
work intensity, and is in favor of operators who install, maintain, or work high above the ground.
Material: Aluminum alloy 6061-T6;
Main Tube: OD 50.8mm, Thickness: 2mm;
Other size can be customized
Code | Platform Height | Platform Size | Total Height |
AT01 | 2.0m | 0.75*2.0m | 3.0m |
AT02 | 4.0m | 0.75*2.0m | 5.0m |
AT03 | 6.0m | 0.75*2.0m | 7.0m |
AT04 | 8.0m | 0.75*2.0m | 9.0m |
AT05 | 10.0m | 0.75*2.0m | 11.0m |
AT06 | 2.0m | 1.35*2.0m | 3.0m |
AT07 | 4.0m | 1.35*2.0m | 5.0m |
AT08 | 6.0m | 1.35*2.0m | 7.0m |
AT09 | 8.0m | 1.35*2.0m | 9.0m |
AT10 | 10.0m | 1.35*2.0m | 11.0m |
1. Are you trading company or manufacture?
We have two factories in Jiangsu and Heibei Province
2. How about the delivery time?
10-15 days after receiving the deposit (1*40FT)
We can sent out products within 2 days if we have stock
3. What's your production capacity?
Jiangsu factory produce 20000 tons one year.
Heibei factory produce 30000 tons one year.
4. What certificates do you have?
We have ISO 9001, ISO14001, OHSAS 18001, CE, SGS, ANSI, AS/NZS and etc.
5. Can you do customized design?
Yes, our professional technical team will offer you perfect solution
6. Do you support sample order?
Yes, we can offer samples for testing before placing batch order
7. What is your payment term?
Our payments are usual T/T and L/C. But some quality customers will offer 30-45 days credit