• Steel Construction Aluminum Prop Scaffolding Formwork
  • Steel Construction Aluminum Prop Scaffolding Formwork
  • Steel Construction Aluminum Prop Scaffolding Formwork
  • Steel Construction Aluminum Prop Scaffolding Formwork
  • Steel Construction Aluminum Prop Scaffolding Formwork
  • Steel Construction Aluminum Prop Scaffolding Formwork

Steel Construction Aluminum Prop Scaffolding Formwork

Material: Steel
Type: Fixed
Structural Style: Multi-Pole Scaffolding
Framework: Combined Scaffolding
Supporting Mode: Projecting Scaffolding
Lapping Form: Full Scaffolding
Samples:
US$ 15/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Manufacturer/Factory, Trading Company
Diamond Member Since 2021

Suppliers with verified business licenses

Jiangsu, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
R&D Capabilities
The supplier has 1 R&D engineers, you can check the Audit Report for more information
to see all verified strength labels (15)

Basic Info.

Model NO.
model C
Erection Position
External Scaffolding
Move Method
Attached Lifting Scaffolding
Scaffolding Part Type
Scaffolding Planks
Construction Properties
Installation Scaffold
Materials
Q235/Q355 Strength Steel
Certificate
ISO, CE, SGS
Function
External, Supporting
Structure
Multidirectional Type
Surface
Hot DIP Galvanized
Manufacturability
30 Containers/Month
Transport Package
Steel Frame
Origin
Wuxi, China
HS Code
73084000
Production Capacity
100 Tons Per Day

Product Description

Concrete Formwork for pouring shear wall and column

High flexibility with only a few main components can meet any construction requirements. Timber beam H20, steel waling, plywood and clamp etc...These components can be combined for all shapes, even with the restructuring of wall formwork units when a frequent change of the building structure plans happens. 

Advantages: 
1. Can create any shape and size of wall formwork with any thickness. 
2. Can choose whichever form face material best meets your requirements - e. G. For smooth fair-faced concrete. 
3. Depending on the concrete pressure required, the beams and the steel waling are spaced closer or apart. This ensures optimum form-work design and the greatest economy of materials. 
4. Can be pre-assembled on your site or before arrival at your site, saving time, cost and space for you. 
5. Can match well with most Euro formwork systems. 


Steel Construction Aluminum Prop Scaffolding FormworkSteel Construction Aluminum Prop Scaffolding FormworkSteel Construction Aluminum Prop Scaffolding Formwork


Scaffolding Project Case

Load test
Steel Construction Aluminum Prop Scaffolding Formwork
Scaffolding Certificate
Steel Construction Aluminum Prop Scaffolding Formwork
1.  Q: What is your product range? A: Ringlock, Cuplock, Frame, Couplers, aluminum scaffolding tower, scaffolding accessories.
     Q: What is MOQ? A: Usually we don't have a MOQ, but it depends on the product you are looking for.

2.  Q: What kind of payment term do we accept?  A: West Union, T/T and L/C.
     Q: Can I get samples? Yes, we offer free samples on most itmes if it is not too heavy or big. freight collect
     Q: How is your factory's production capacity? A: Over 500 tons per month.

3.  Q; Where have you been exported? We have exported to Asia, South Ametica, Europe, Africa and Middle east.
     Q: What kind of international certificate do we offer? A: CE certificate and SGS test report.
     Q: How can you assure the welding quality?  A: We have made the flaw detection test which can prove the good welding quality.

4.  Q: What is production time?  Usually it takes 25-30 days for the first container,production goes faster after the first container once 
     all raw materials are ready.The more the faster. Partial shipment can be arranged if requested.

5. Q: How does your factory control quality? 
   A: Our strict quality control system ensures all products well made step by step. All the raw materials are bought from professional 
   steel manufacturers, with Mill Test Certificates offered. Our quality control persons inspect and monitor the whole process from 
   raw material, cutting, pressing, welding, matching, surface finish, finishing process, packing, container loading and transportation.

6. Q: How is the bearing capacity of your scaffolding?
    A: It depends on which kind of scaffolding, scaffolding sizes, and the setup plan. We have many test reports for your reference.

7. Q: How High can your scaffolding reach to?
    A: Normally, we suggest our client to setuo the scaffolding maximum reach to 30 meters. But some of our customers setup our
    scaffolding reach to 50 meters. According to safety documents, every 20 meters, we need to make a steel platform where the 
    scaffolding can be setup continually.

8. Q: What is your after-sale service?  A: All the after-sale problems will be solved based on mutual friendly communication.
    In case of quantity shortage,the detailed certificates should be sent to our side in seven days after the goods arrive at  your 
    warehouse.  In case of quality discrepancy,such as problems caused by raw material,welding,or surface finish,the detailed 
    certificates should be sent to our side.If it is confirmed caused by our side for the above two mentioned situations,the loss 
    will be compensated as the new goods sent to your side in next order.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now